Menu
 
Afvanding af RDF/SRF

Dewatering RDF/SRF

RDF/SRF is waste used as fuel in incineration plants for energy production or in cement kilns. For optimizing the value of the fuel it can be necessary to dewater it. The RUNI screw compactor is able to dewater RDF/SRF in a continuous process with a low use of energy.

The conditions at RDF facilities are extremely demanding and plants are working 24/7 all year round. In the RDF there are often abrasive elements like sand. Therefore great demands are required of the machine and the RUNI can do it.

Where Does the RDF /SRF Waste Come From? 

The RDF/SDF can be generated from reject from paper mills or from MSW (municipally solid waste). Often it is shredded down to around 10 mm in size and can therefore easily be fed to the RUNI.

Downloads

Read more about our solution for dewatering RDF in the datasheet below.

The RUNI Screw Compactor Solution for RDF /SRF Waste

The RUNI SK370 screw compactor has for many years proved to be a liable and strongly built screw compactor with reinforced screw and constructed to work 24/7 with a capacity of 5-10 tonnes per hour.

The screw compactor can be installed as the last link in the line. The machine can be fed with material via conveyor belt or directly under a rotating drum.

The RUNI achieves up to 75% of dry matter after dewatering RDF/SRF waste.

Contact Us

If you need more information or have questions about RUNI products, please fill out the form below. We will get back to you as soon as possible.

Learn more about our privacy and cookie policy.

Contact

+45 9737 1799
runi@runi.dk

Industriparken 8,
6880 Tarm, Denmark

Contact US Office

+1 (630) 422-3172
runi-us@runi.dk

351 Country Club Drive,
Bensenville, IL 60106